Production Achievement
14,280
/ 15,000 Pcs
Pencapaian Target
95.2%
Yield Rate (Quality)
99.42%
+0.12%
Standar Target Minimum: 99.00%
Re-Inspect Status: reinspectsystech01
NG Rate & Alert Trigger
2
NG (Last Form MA001)
NORMAL (NG ≤ 5)
Batas Ambang Alarm: NG > 5 Pcs / Lot
Machine Status & Downtime
14 Min
MA001: RUNNING
Suhu Mesin (MA001):
45.0 °C
Total Mesin Aktif:
11 / 12 Unit
Production Achievement per Jam (Target vs Actual)
Sumber Data: ConMas Daily Production Form
Tren NG Harian & Batas Alarm
Sumber Data: Daily Inspection Form
Live Incoming Data — ConMas i-Reporter (Trigger-Based)
Menampilkan kiriman JSON otomatis saat operator menekan tombol Confirm/Save di iPad
| Timestamp | Form Template | ID Mesin | Suhu | Qty OK | Qty NG | Status Hasil |
|---|---|---|---|---|---|---|
| 08:48:30 | DAILY INSPECTION FORM (Mesin A) | MA001 | 45°C | 480 | 2 | OK |
| 08:30:12 | DAILY INSPECTION FORM (Mesin B) | MA002 | 43°C | 510 | 1 | OK |
| 08:15:05 | RE-INSPECTION SHEET | MA004 | 46°C | 495 | 3 | OK |
| 08:00:44 | DAILY INSPECTION FORM (Mesin A) | MA001 | 44°C | 500 | 0 | OK |
Status Mesin Lantai Produksi
Indikator warna real-time berdasarkan laporan i-Reporter
MA001 (Mesin A)
Suhu: 45°C | NG: 2
MA002 (Mesin B)
Suhu: 43°C | NG: 1
MA003 (Mesin C)
Setup Changeover
MA004 (Mesin D)
Suhu: 46°C | NG: 3
ConMas Server: 36.93.215.154:8000
Auto-Refresh: ON (Trigger)
Machine Status & Location Track Record (Audit Trail TPM)
Rekam jejak status operasional, alasan non-aktif, serta posisi fisik mesin di area pabrik
| ID & Nama Mesin | Status Operasional | Alasan / Keterangan | Posisi / Line Saat Ini | Timestamp Update |
|---|---|---|---|---|
| MA001 (Mesin A) | RUNNING | Produksi Normal Shift 1 | Line 1 - Assembly Section | 25/10/2026 08:48 |
| MA002 (Mesin B) | RUNNING | Produksi Normal Shift 1 | Line 1 - Assembly Section | 25/10/2026 08:30 |
| MA003 (Mesin C) | MAINTENANCE | Scheduled Preventive Maintenance (Mold Cleaning) | Maintenance Workshop (Area B) | 25/10/2026 07:15 |
| MA004 (Mesin D) | RUNNING | Produksi Normal Shift 1 | Line 2 - Terminal Section | 25/10/2026 08:15 |
| MA005 (Mesin E) | BREAKDOWN | Waiting for Sparepart Replacement (Sensor Unit) | Line 3 - Molding (Standby Corner) | 24/10/2026 16:40 |