Hirose Electric Logo

PRODUCTION & QUALITY REAL-TIME DASHBOARD

ConMas i-Reporter (v8.2) MotionBoard Integration | PT. Hirose Electric Indonesia

LIVE API CONNECTED
--:--:-- WIB
Production Achievement
14,280 / 15,000 Pcs
Pencapaian Target 95.2%
Yield Rate (Quality)
99.42% +0.12%
Standar Target Minimum: 99.00%
Re-Inspect Status: reinspectsystech01
NG Rate & Alert Trigger
2 NG (Last Form MA001)
NORMAL (NG ≤ 5)
Batas Ambang Alarm: NG > 5 Pcs / Lot
Machine Status & Downtime
14 Min MA001: RUNNING
Suhu Mesin (MA001): 45.0 °C
Total Mesin Aktif: 11 / 12 Unit

Production Achievement per Jam (Target vs Actual)

Sumber Data: ConMas Daily Production Form

Shift 1 (07:00 - 15:00)

Tren NG Harian & Batas Alarm

Sumber Data: Daily Inspection Form

Max Limit: 5

Live Incoming Data — ConMas i-Reporter (Trigger-Based)

Menampilkan kiriman JSON otomatis saat operator menekan tombol Confirm/Save di iPad

Timestamp Form Template ID Mesin Suhu Qty OK Qty NG Status Hasil
08:48:30 DAILY INSPECTION FORM (Mesin A) MA001 45°C 480 2 OK
08:30:12 DAILY INSPECTION FORM (Mesin B) MA002 43°C 510 1 OK
08:15:05 RE-INSPECTION SHEET MA004 46°C 495 3 OK
08:00:44 DAILY INSPECTION FORM (Mesin A) MA001 44°C 500 0 OK

Status Mesin Lantai Produksi

Indikator warna real-time berdasarkan laporan i-Reporter

MA001 (Mesin A)
Suhu: 45°C | NG: 2
RUN
MA002 (Mesin B)
Suhu: 43°C | NG: 1
RUN
MA003 (Mesin C)
Setup Changeover
IDLE
MA004 (Mesin D)
Suhu: 46°C | NG: 3
RUN
ConMas Server: 36.93.215.154:8000 Auto-Refresh: ON (Trigger)

Machine Status & Location Track Record (Audit Trail TPM)

Rekam jejak status operasional, alasan non-aktif, serta posisi fisik mesin di area pabrik

Total Asset Tracked: 12 Units
ID & Nama Mesin Status Operasional Alasan / Keterangan Posisi / Line Saat Ini Timestamp Update
MA001 (Mesin A) RUNNING Produksi Normal Shift 1 Line 1 - Assembly Section 25/10/2026 08:48
MA002 (Mesin B) RUNNING Produksi Normal Shift 1 Line 1 - Assembly Section 25/10/2026 08:30
MA003 (Mesin C) MAINTENANCE Scheduled Preventive Maintenance (Mold Cleaning) Maintenance Workshop (Area B) 25/10/2026 07:15
MA004 (Mesin D) RUNNING Produksi Normal Shift 1 Line 2 - Terminal Section 25/10/2026 08:15
MA005 (Mesin E) BREAKDOWN Waiting for Sparepart Replacement (Sensor Unit) Line 3 - Molding (Standby Corner) 24/10/2026 16:40